Concluded
The facility includes two buildings: “Casa de Infantes” and “Guarda de Corps”. The facility has recently been handed over to the Owner, Paradores Nacionales de Turismo.
Concluded
The contract included the design and the project management of the construction (DiGEST system). The use is mainly industrial, but it also includes 1.000 sm of prime quality office space and a 2.000 sm lay-up facility.
Concluded
This industrial aerospace facility comprises a few industrial buildings turning it to be the largest aerospace facility in the Northern Madrid area.
Concluded
80.000 sqm project recently finished. AXXO was hired to perform the Construction Project Management, and the contract was awarded in joint-venture with Eurconconsult.
Ongoing
3.500 sqm office building with 3 parking levels and 4 storeys, high quality finishings.
Concluded
AXXO's duty was to perform the Project Monitoring for some of the lastest residential projects delivered by BBVA. Molina de Segura, La Algaba Pinto, Vallecas or Carabanchel were some of the locations in which AXXO worked as Project Monitor.
Ongoing (Construction phase)
From 2002, AXXO has been working with Mapfre to design and build PPR Centres, also called Fast Checking Auto Centres.
Concluded
The biggest challenge of this job was to accomplish the perfect coordination of eight teams located in different continents (Europe and America) and yet keep the project right on track.